Skip to main content

Explore our success stories

Case study on MICROMAX Heavy-brine replacement

Replacing heavy brines in completion and workover fluids

Discover how a Middle East operator kept fluid density stable for 280+ hours in deep, high-pressure gas wells, where heavy brines and barite muds had failed.

Case study Micromax HPHT Acid Wash

Stimulating an HPHT well with a quarter of the usual acid

Discover how a Middle East operator boosted productivity 3x after a single acid wash, using a quarter of the usual acid volume in a deep, naturally fractured Jurassic reservoir.

Case study Sour gas cleanup

Removing filter cake in HPHT sour-gas wells

Discover how a potassium formate fluid enabled 100% filter-cake removal in 6 hours at 305 °F, even in a sour-gas reservoir where strong acids were off the table.

Case study Stuck pipe

Mitigating stuck-pipe risk with an acid-soluble drilling fluid

Discover how a Middle East operator recorded zero stuck-pipe incidents across two field-trial wells, using a fluid designed to dissolve on acid when a pipe is differentially stuck.

Oilfield case-study

Improving deepwater drilling efficiency and cost with a single RDIF

Discover how switching to a single reservoir drill-in fluid (RDIF) is transforming deepwater drilling efficiency in Guyana, cutting overall project costs and execution time by 20% compared to the industry average.

MICRODENSE GUYANA ECD Case studies

Eliminating sag and losses in Guyana deepwater wells

Discover how redesigning reservoir drill-in fluids with MICRODENSE® weighted systems resolved barite sag and formation losses in Guyana's deepwater wells—achieving an average 0.7 ppg ECD reduction to accelerate tripping times and maximize well productivity.

Microdense Middle east ERD Case study

Doubling production from extended-reach wells in the Middle East

Discover how innovative drilling fluid technology enabled extended-reach laterals beyond 23,000 ft in the Middle East—overcoming severe ECD losses and high torque to achieve 2x production rates compared to offset wells.

Case studies Simplifying offshore logistics with bulk conveyance

Simplifying offshore logistics with bulk conveyance

Discover how bulk pneumatic conveyance eliminates time-consuming big-bag handling for micronised weighting agents—streamlining offshore logistics, reducing dust hazards, and achieving a 52 m vertical transfer at just 2 bar of pressure.

Case study Doubling penetration rates in hard rock drilling

Doubling penetration rates in hard rock drilling

Discover how optimized drilling fluid formulations overcome the slowness of hard rock drilling, delivering a 100% increase in rate of penetration compared to conventional barite-weighted fluids.

Case study Drilling seven ultra-HPHT wells with a single fluid system

Drilling seven ultra-HPHT wells with a single fluid system

Discover how a single high-temperature fluid system maintained ultra-stable rheology under extreme conditions above 400 °F (204 °C) in the North Sea—achieving 0 NPT related to drilling fluids across seven ultra-HPHT wells.

Case study Completing two reservoirs with one non-damaging fluid

Completing two reservoirs with one non-damaging fluid

Discover how a single non-damaging fluid enabled the completion of two separate reservoirs in the North Sea—maintaining wellbore stability and zero corrosion while achieving 100%+ return permeability with no formation damage.

Case study Tripling production by replacing oil-based drilling fluids

Tripling production by replacing oil-based drilling fluids

Discover how replacing oil-based drilling fluids with a custom non-damaging water-based system in deep HPHT gas wells in the Middle East eliminated formation damage—delivering 3x higher production rates compared to offset wells.

Case study: Drilling five ‘undrillable’ TTRD wells in the North Sea

Drilling five ‘undrillable’ TTRD wells in the North Sea

Discover how a fluid system weighted with finer materials enabled the successful drilling of five 'undrillable' TTRD wells in the North Sea—reducing equivalent circulating density (ECD) by 50% compared to API barite and remaining well below the fracture gradient.

Case study Drilling an ultra-HPHT well three days ahead of plan

Drilling an ultra-HPHT well three days ahead of plan

Discover how a thermally stable fluid system enabled the drilling of an ultra-HPHT exploration well in Southeast Asia at 455 °F (235 °C)—reducing drilling time to total depth by 3 days ahead of plan.

Explore our success stories

Improving deepwater drilling efficiency and cost with a single RDIF
Case study

Improving deepwater drilling efficiency and cost with a single RDIF

20%

project costs and execution time vs industry average

Read more
Eliminating sag and losses in Guyana deepwater wells
Case study

Eliminating sag and losses in Guyana deepwater wells

0.7 ppg

average ECD reduction

Read more
Doubling production from extended-reach wells in the Middle East
Case study

Doubling production from extended-reach wells in the Middle East

2x

production rates vs offset wells

Read more
Simplifying offshore logistics with bulk conveyance
Case study

Simplifying offshore logistics with bulk conveyance

52 m

vertical transfer at 2 bar

Read more
Doubling penetration rates in hard rock drilling
Case study

Doubling penetration rates in hard rock drilling

100%

increase in rate of penetration

Read more
Drilling seven ultra-HPHT wells with a single fluid system
Case study

Drilling seven ultra-HPHT wells with a single fluid system

0 NPT

related to drilling fluids

Read more
Completing two reservoirs with one non-damaging fluid
Case study

Completing two reservoirs with one non-damaging fluid

100%+

return permeability

Read more
Tripling production by replacing oil-based drilling fluids
Case study

Tripling production by replacing oil-based drilling fluids

3x

higher production rates

Read more
Drilling five 'undrillable' TTRD wells in the North Sea
Case study

Drilling five 'undrillable' TTRD wells in the North Sea

50%

lower equivalent circulating density

Read more
Drilling an ultra-HPHT well three days ahead of plan
Case study

Drilling an ultra-HPHT well three days ahead of plan

3 days

ahead of plan

Read more
Replacing heavy brines in completion and workover fluids
Case study

Replacing heavy brines in completion and workover fluids

280+ h

static in the well with no change in density

Read more
Stimulating an HPHT well with a quarter of the usual acid
Case study

Stimulating an HPHT well with a quarter of the usual acid

3x

productivity after one acid wash

Read more
Removing filter cake in HPHT sour-gas wells
Case study

Removing filter cake in HPHT sour-gas wells

100%

filter-cake removal in 6 hours

Read more
Mitigating stuck-pipe risk with an acid-soluble drilling fluid
Case study

Mitigating stuck-pipe risk with an acid-soluble drilling fluid

0

incidents of stuck pipe across two wells

Read more

Contact us

Take your business to the next level by partnering with a world-leading material manufacturer.